Hello,
Log reports view does not behave the same way in ‘Deadline 5’ and ‘Deadline 6’.
With ‘Deadline 5’ it is possible to read many different jobs log at same time, with ‘Deadline 6’ you can only read report of the selected job in main GUI.
How can I read different jobs reports at same time with ‘Deadline 6’ ?
Thanks
Hello,
Other than saving reports out to view with a text editor, I don’t know of any way to do that. We made the changes to a dynamic job report window, which refreshes with each new job you click, so as to avoid the clutter of too many report windows open.
FYI. I’ve added this as a feature request on the wishlist 
Hello,
In fact both behaviors are interesting.
Sometimes you are glad that reporter view shows current selection only.
Sometimes when you are investigating on problems you are glad to be able to compare 2 logs of 2 jobs of the same nature.
The distinction would be:
Report view panel from View menu shows current selection.
Report view from contextual menu above one job shows job’s log.
Until then, I do select all / copy /paste in ‘notepad’, there is nothing else to do.
Thanks