So I’ve got an existing Maya/Redshift farm that has 2x 1080ti machines and I just added newer machines that have 4x2080ti.
I would like to divide the job so that the 2x1080ti machines have one task and the 4x2080ti machines have 2 concurrent tasks. I can easily submit the job so that all machines have 2 concurrent tasks, but I don’t know how to make it so that the slower machines have 1 task and the faster machines have 2.
Is there a way to do this that doesn’t involve scripting (which won’t happen)?
Thanks.
Jon