Hello
Right now I have a script which would change search the farm for ‘active’ jobs and change concurrent task depending on their CPU usage. I want this script to be run every 30minutes to optimize all the running jobs on the farm. Is there an option on deadline to set a timer which would run this script. I could write my own timer , but I was wondering if there is a built in deadline option which would be able to do this.
Thanks