Changing frame list of a running job

I think that it was possible to change the frame list of a running job in previous versions.



In version 2.0 I have to pause the job to be able to change the frame list.



Is it possible to change it back, I don’t like this new behavior. Maybe there is a technical reason for the new method, but I liked the old one better.



Thanks



Sylvain Berger | Technical Director | Alpha Vision


You’re right, it was a technical issue. It will be changed back in the next version, as the refactoring we’ve done fixes the problems that we ran into in the current version regarding this feature.



Cheers,



Ryan Russell

Frantic Films Software

http://software.franticfilms.com/

(204)949-0070

Thanks Ryan, this is good news!

A lot of user will be happy here :slight_smile:



Sylvain Berger | Technical Director | Alpha Vision