I think that it was possible to change the frame list of a running job in previous versions.
In version 2.0 I have to pause the job to be able to change the frame list.
Is it possible to change it back, I don’t like this new behavior. Maybe there is a technical reason for the new method, but I liked the old one better.
Thanks
Sylvain Berger | Technical Director | Alpha Vision
You’re right, it was a technical issue. It will be changed back in the next version, as the refactoring we’ve done fixes the problems that we ran into in the current version regarding this feature.
Cheers,
Ryan Russell
Frantic Films Software
http://software.franticfilms.com/
(204)949-0070
Thanks Ryan, this is good news!
A lot of user will be happy here
Sylvain Berger | Technical Director | Alpha Vision