AWS Thinkbox Discussion Forums

Deadline 9.0.0.16 (Release Candidate 6)

If you’re wondering what happened to 8.1, check out the 9.0.0.9 thread here: forums.thinkboxsoftware.com/vie … 09&t=15144

IMPORTANT NOTICE FOR ALL USERS:

If this is your first time installing a 9.0 build:

  • Before you install Deadline 9.0 RC 6, you should email beta@thinkboxsoftware.com and request an updated 9.0 beta license. If you happen to be using Usage Based Licensing, your render time will still be compatible with 9.0.
  • If you wish to use an SSL enabled MongoDB installation, you should install a fresh Repository and Database using the Repository installer. If you wish to stick with your existing Repository and Database, just choose to connect to an existing Database as usual.
  • You should use the Deadline Client installer to upgrade your client machines to 9.0, and not use auto-upgrading.

If you already have a previous install of 9.0, you can use auto-upgrading to upgrade to this build.

Please read the Deadline 8.1/9.0 Licensing and Compatibility thread for important information regarding Deadline 9.0:
forums.thinkboxsoftware.com/vie … 09&t=14476

Full release notes can be found in the Deadline 9.0 documentation (see Downloads below).

Downloads
Installers and Documentation: thinkboxsoftware.box.com/s/n5wh … vpmhgjz14z

Deadline 9.0 RC 6 Release Notes (9.0.0.16)

This release includes various bug fixes and minor improvements across the board, but also includes all the fixes made in intervening builds of Deadline 8.0, up to (and including) v8.0.17.1. This includes a fix for a bug that could affect UBL/3PL render time usage.

Application Plugin Improvements

Maya

  • Added an option to the MayaCmd and MayaBatch plugins to fail the render when an Arnold license error is detected.

VRED

  • VRED 2017.1 and 2017.2 are now supported.
Privacy | Site terms | Cookie preferences