Hello All,
I have an issue after upgrading and hours upon hours of troubleshooting. I spun up a new Deadling Server and finally got it up and running. However I was able to get just one of my rendering servers to connect. I cannot get the rest to connect for the life of me. I am hoping someone has seen these errors before.
This is about the same message for all of them.
2026-03-06 15:25:17: BEGIN - RAXX1\desktopuser
2026-03-06 15:25:17: Operating System: Windows 11 Pro for Workstations
2026-03-06 15:25:17: CPU Architecture: x64
2026-03-06 15:25:17: CPUs: 192
2026-03-06 15:25:17: Video Card: Microsoft Remote Display Adapter
2026-03-06 15:25:17: Deadline Monitor 10.4 [v10.4.2.3 Release (d44a43016)]
2026-03-06 15:25:17: Time to initialize: 62.000 ms
2026-03-06 15:25:24: Auto Configuration: No auto configuration for Repository Path could be detected, using local configuration
2026-03-06 15:25:24: Auto Configuration: Unable to receive a response from Pulse, response may have been malformed
2026-03-06 15:25:24: Connecting to Deadline RCS 10.4 [v10.4.2.3 Release (d44a43016)]
I am down in the dirt and trying to get the farm back up. This is all local on PreM.
