Hi there,
I could be missing something completely obvious but where can I see how long the remaining tasks have left with their current allocation of nodes on that job? I found that invaluable and often un-cannily accurate in most cases on 5.2.
Hi there,
I could be missing something completely obvious but where can I see how long the remaining tasks have left with their current allocation of nodes on that job? I found that invaluable and often un-cannily accurate in most cases on 5.2.
Hi Jamie,
Do you mean the “job details” panel in the monitor, under “Statistics” > “Estimated Time Remaining”.
Mike
Indeed that’s the info I was looking for Mike ta!
This’ll be more moving into a more ux topic then since I found it was really handy having that up in the top right on upper task list, specially when we’ve had a tonne of shots running and I’m assessing the machine limits to even out the queue.
[size=85]edit :This is a minor point, please, don’t let my lack of discovering where things have settled down into come across as insisting on change [/size]
We had removed it from the task list because of the new Search box, but I think we have enough space to add it back in.
Cheers,